All 72 RAAF F-35s now delivered

The delivery of the final nine of Australia’s fleet of 72 F-35A Lightning II aircraft that occurred earlier in December was formally announced today by Minister for Defence Industry and Capability Delivery Pat Conroy, who tried to claim maximum political points for an expedited delivery schedule.

FILE PHOTO: One of the first two Royal Australian Air Force F-35A Lightning Joint Strike Fighters flies overhead RAAF Base Williamtown on delivery day (10 December 2018). Photo by Brian Hartigan.

The first two F-35A Lightning II aircraft arrived in Australia on 10 December 2018.

Minister Conroy said the F-35A aircraft fleet, in conjunction with the EA-18G Growler and F/A-18F Super Hornets, were the cornerstone of Australia’s air-defence and strike capability.

“As a multi-role fighter, the F-35A can perform air-to-air and air-to-surface missions, and use stealth technology, electronic protection, electronic attack and advanced countermeasures to maximise lethality and survivability,” he said.

“The arrival of the final nine aircraft also demonstrates an enhancement of the warfighting capability of Australia’s F-35A fleet, with these aircraft the first in the fleet to receive Technology Refresh 3, enabling Block 4 upgrades that will support new and enhanced capabilities required to meet evolving threats.

It has been reported elsewhere that the Albanese Government has ruled out expanding the F-35 fleet to 100 aircraft, as the Royal Australian Air Force said it want


.

.


.


.

7557 Total Views 16 Views Today

Posted by Brian Hartigan

Managing Editor Contact Publishing Pty Ltd PO Box 3091 Minnamurra NSW 2533 AUSTRALIA

2 thoughts on “All 72 RAAF F-35s now delivered

  • 19/01/2025 at 12:12 pm
    Permalink

    Were there any reasons proffered for the staggering reduction in the number of aircraft? Sure they are pricey, but what price national security. Should we get into a hot situation and there are some losses, we may well rue the day that we put Labor in charge of National Security, and the cuts that that they implemented. We can’t make any replacements, so it would be strategically sensible to have some kit ready for use. Quite frightening really.

    Reply
  • 18/01/2025 at 11:36 am
    Permalink

    Now I suppose we wait for the never-ending updates to begin as happens with all new aircraft.

    Reply

Leave a Reply

Your email address will not be published. Required fields are marked *